Single stranding machine operation method

Views: 3     Author: Site Editor     Publish Time: 2022-09-30      Origin: Site

1. High-speed cantilever single stranding machine before the start of preparation

(1) according to the production task to check the semi-finished product processing, process documents, work clothes, and equipment are complete and practical.


(2) check the handover records. There are no equipment safety accident records. Check the rotating parts of the equipment. Standard parts have not loosened down condition. Lubrication parts to oil. The water inside the oil and gas separator is cleared and cleaned, and the oil in the oil mark must not be less than 1/3.


(3) The winding disk is installed on, the top should be screwed tightly, the cap should be twisted tightly, and the bumper should be pulled off.


(4) adjust the working pressure of each valve, brake pedal support force, winding brake pedal, and winding tension to reach the appropriate working pressure.


(5) Check whether the towing is calibrated and the safety door is closed tightly.

1000 Single twist cabling machine1


2、High-speed cantilever type single stranding machine driving manufacturing

(1) turn on the chassis power, set the server, rap package orientation, and length.


(2) disconnect the linkage and access to single-action. Server, rap packet headway rate to the minimum. Open the server first, reopen the package belt machine, adjust the rapping package speed and support force, and make the rapping package section diameter and appearance design conform to the regulations.


(3) Break off the single action, and access the continuous action and the server to speed up normal production and manufacturing.


(4) The operator should work hard during the production process and not switch jobs or allow non-operators to start this equipment.


(5) the production process operator timely understanding of the machine's ambient temperature, noise, vibration, etc., such as the appearance of abnormalities need to stop in time to check, row out the common failures, such as operators can not solve to ask professional equipment maintenance workers to deal with.


3、High-speed cantilever type single winch parking clearance

(1) first, attentively shift the knob to the least, in the parking button, in power off.


(2) fill out the handover record with care.


(3) wipe test equipment, and maintain the equipment's external environment clean, neat, and tidy, with no dirt.


(4) Work clothes measuring instruments, semi-finished processing neatly placed.


(5) clean up and tidy within 3m around the equipment.


4、High-speed cantilever type single stranding machine operating procedures

(1) after the switch power access, the display lights indicate normal before being easy to operate.


(2) up and down the plate should avoid smashing and squeezing injury.


(3) The equipment can not be rotated under the premise of pressing the tight parking (other than emergency conditions)


(4) The safety protection of the equipment must be turned off before starting the equipment.


(5) Before starting the machine, must press the alarm and notify the machine operator to make a good preparation for driving in advance


(6) When the operator leaves the equipment, turn off the machine before leaving.